1.We will pack by the protect film inner, water-repellent plastic outside.
2.Then put into plywood box.
3.The machine will be fixed by steel rope in the container. Make sure it is in good condition when it arrives.
Port
Qingdao
Supply Ability
Supply Ability
500 Set/Sets per Month Maize Flour Milling Machine